The Packer Collegiate Institute
Location 170 Joralemon St, Brooklyn, NY
JRM Construction Management completed an interior fit-out for The Packer Collegiate along with the construction of a new five-story middle school building and an adjoining stair tower building. The multi-phase project included the excavation of St. Ann’s Church, pouring new footings, a new slate roof, windows, elevator, fire escapes, and a total brownstone facade restoration. A new five-story steel framed structure was constructed as Packer’s new middle school building.
The adjacent Parish building was gutted and revived with all-new steel framing to house a cafeteria, kitchen, and balcony. In an effort to link the church and parish to the new openings in the existing school building, a five-story cast-in-place concrete brick-face stair tower was erected. Additional project features included music classrooms with glass-framed terraces, a chiller, all-new HVAC, electrical, plumbing, and sprinkler systems